Digital Signage in Construction Industry

Digital Signage :

It is digital board which use technologies like LCD & LED to show various contents like video, 3D image, instructions, whether data, etc. Also use for advertising purpose.

Photo via moodmedia.com.au

Where it is used? 

  • Hotels
  • Lodge
  • Restaurants
  • Shopping Malls
  • Exam Halls, etc
Photo via theconstructionindex.co.uk


Digital Signage in Construction ( For Facility Management purpose ) :

  • Site safety
  • Training for employees
  • Reporting
  • Project Management
  • Planning
  • Remodeling

Photo from mcsmag.com


---------------------------------------------------------------------




Thursday, 12 November 2020

Lean Construction Management Method

Construction project Management is a method of handling of project most effectively, efficiently. Construction project management manages the project resources & keeping good quality and achieve the quality of excellence.


Photo via kore- system.com


What is Lean Construction Management?
The word 'Lean' means slender, cheap & the opposite that 'Fat' means the reduction of fat and fat in the construction means overproduction that is waste in construction. Then the reduction of fat in the construction this method is known as 'Lean Construction Management.'
Simply, The reduction of waste in the process is known as Lean Construction Management.


Photo via whatislean.org



Elimination of the waste :
  • Defect - Defect means the work is not doing correctly first time then resulting in rework that means the wastage of time & material. Also generate the scrap or rework due to defect.
  • Overproduction - In the construction any work is completed before the deadline of that work then there can happen the overproduction.
  • Lack of planning - Planning is required for every month, every week, every day and also for every task. If planning is not done properly then there is the chances of generation of waste.
  • Transportation - It happens when the unnecessary transmission of information that means 
  • Waiting - Waiting for construction when the labours are ready & some old work are incomplete before the starting of new work.
  • Excess Inventory - Material is not required on site but order the material & store it for a long time resulting material is weak & effect on quality of construction.
Note that Lean Management is a method of removing waste, not for  minimizing waste....


---------------------------------------------------------------------

Saturday, 7 November 2020

Gabion Technology

Gabion is a net of welded wire which contain the material such as stone, sand, concrete,rock, soil, etc. The name Gabion was coming from Italian word Gabbia it means big and Latin word cavea it means cage & combination of these words  form Gabion.


Gabbia + Cavea = Gabion

( Big )   + ( Cage ) = ( Big Cage )

Advantages:

  • Gabion technique is used for erosion protection & slope stability.
  • It provides good strength.
  • It improves stability & durability.
  • This technique is not harm to nature it is environment friendly.

  • Good flexibility.
  • It is also used for flood protection.

  • It provides good permeability.
  • Very high resistance to corrosion.
  • Also, it is economical.

Types of Gabions:

1) Gabion Basket -

  • Specially designed for highway & railway work. 
  • It forms a box in different dimensions.

2) Gabion Wire Mesh -

  • It is used for avoiding fallen of rocks, stone on road & railway tracks in topographical region.
  • It provides the erosion to slope.

3) Decorative Gabion - 



  • It is also used for decorative purpose in gardening for landscaping & increase the beauty.

4) Gabion Sacks - 

  • Gabion Sacks are formed fast.
  • It is used in the hydraulic elements.
  • This is just a protective coating for erosion.


-----------------------------------------------------------------------










Tuesday, 3 November 2020

3D Zebra Crossing Invention

Zebra crossing on the road is used for the crossing of the road. Sometimes vehicles come fast nearby zebra crossing & accident are happening there. Zebra crossing are 2D & white in colour but for reducing accident near zebra crossing 3D zebra crossing invention there in India

3D Concept:

  • In that three dimensional ( Length, Breadth, Height or depth ) zebra crossing is used.
  • Using this concept we reduce accidents.
  • Also we reduce the speed of vehicles in urban area by providing 3D zebra crossing.

2D Zebra Crossing:



3D Zebra Crossing:




---------------------------------------------------------------------

Monday, 2 November 2020

Largest Floating Solar Power Project in India

Overview:
  • Location - at Banasura Sagar reservoir, Wayanad, Kerala.
  • Owner - Kerala State Electricity Board
  • Power generation - 500 kwp
  • Occupied by - 1.25 acres of water 
  • Solar Panels - 1938 panels
  • Material Used - 18 ferro cement
  • Inauguraed - 2017



Features
  • Largest project in India
  • Floating Power Project
  • High efficiency panels
  • SCADA System used in this project for monitoring power generation


Note : This power plant is established in 2017 that time it is largest power plant but now, in the year of 2020 one more country's largest solar power plant will constructed by NTPC Ramagundam & BHEL

---------------------------------------------------------------------